Relocation
Problem
??????????????????????
Brief
-
Complete relocation of Dublin office.
- To be
carried out over 4 days.
- All IT
equipment decommissioned and re-commissioned.
- Desk
breakdown and surplus to requirements to be disposed of.
- Single
floor building to multiple floor building.
Solution
A
dedicated project manager was assigned for the duration of the
project and completed an extensive schedule of works. The
logistics team organised the transport, workforce,
accommodation and move vehicles required for the duration of
the project.
The
project had multiple stages and each was completed within the
allotted time, even with the inevitable additions to a project
of this size. Once the new office was up and running a break
down of all surplus / old furniture was then completed and
loaded for environmental disposal.
On the
commencement of the first working day at the new office the
project manager and technical manager where on site to pick up
any move problems and assist with any network problems.
I
|